Schofields road was upgraded to better meet the future transport needs of the North West between Windsor Road, Rouse, Richmond Road Marsden Park. In particular our scope included works within stage two and three. The scope comprised of:
Stormwater drainage installation RCP pipes ranging from 225mm to 1050mm, box culverts and pits
Removal of existing stormwater infrastructure
Subsoil back of curb and no fines drainage
Final handover, clean bench and render of all pits and pipes onsite.