St Marys Waste Water Treatment Facility is one of three plant upgrades for Lower South Creek Treatment Plant Facility program. Works included:
- Excavation and installation of dewatering pump station including the trenching and installation of polyethylene ABS, UPVC SCH80 sludge transfer lines and electrical and communication pits and conduits.
- Excavation and final trim for FAT tank slab
- Disposal of excess materials / dirt and recyclable materials
- Removal of existing concrete road
- Detailed excavation for new waste truck weighbridge including new drainage pits and conduits
- Re-diversion of 150mm PVC fire main for future works
- General labour and plant hire
- Confined space work and testing of all pipework